HOME>PRODUCTS>MILLION GUIDE>User's Manual of GNZ Series

User's Manual of GNZ Series

Z-axis guide installation

  1. Drilling a post and bush installation hole
    • Tap 4 φZPP, φZBP at the post & the bush installation plate.

    Drilling a post and bush installation hole

  2. Guide post installationPost installation
    • Determine the counter mark direction for easy recognition.
    • Fix the post to the installation hole of the plate with the specific bolts.
    • The post perpendicularity must be checked (0.01mm/100mm or less).
  1. Bush installation
    • Combine the post and the bush. Make sure the counter marks and the specific numbers are correspondent.
    • Place the parallel base block on the plate of the post side, put the plate of the bush side on it and fit it to the installation hole.
    • Fix the bush to the plate with the specific bolts.

    Bush installation